Novarc Technologies

SWR Estimated Savings
Analysis

Process & Shop
Labor
Output
Expanded Results
50
1
1
Weld TypePipe DiameterCarbon Steel S40Carbon Steel S80
Butt24"500300
Butt30"-300
Butt36100-
Flange4"200200
Flange6"-300
Flange12"100100
Weld TypePipe DiameterStainless S10Stainless S40
Butt24"500300
Butt30"-300
Butt36100-
Flange4"200200
Flange6"-300
Flange12"100100

Next Steps Benefits

Join over a hundred customers who are realizing measurable savings with the SWR. Complete the form below, and our team will connect with you to review your specific details and potential outcomes.

    Potential Annual Savings (USD)
    $-
    Potential Time to Return
    -
    Summary
    SWR™ Process -
    Estimated Man Hour Labor Savings $ -
    Estimated Man Hour Savings -
    Estimated Fabrication Savings $ -
    Estimated Rework Reduction $ -
    Submit Your Results to Get More Information
    Savings Per Project
    If you are in an industry that is more project or job based, our team can help with a more detailed breakdown for specific project savings or a shorter time period.
    5, 10, and 20 Year Savings Projections
    Get even more details regarding the long term savings benefits of the SWR.
    Full Employee Cost Savings Breakout
    Review an in depth analysis on cost savings based on estimated number of fabricators needed while utilizing SWR and where labor costs can be streamlined.
    Tax Benefits / Rebates (based on state)
    Utilize our team's expertise and insight on potential tax benefits based on your region.
    Continue through the calculator to reveal your savings

    Glossary